Språk:

Safe Caledonia

In 2008 Bars Elekter participated in execution of Safe Caledonia project.
Total amount of working hours spent on this project is 1000.

DETAILS

Drilling rig type: Accomodation rig
Year Built: 1982 (The GVA Kockums yard, Sweden)
Upgraded: 2004
Length (overall): 91.29m
Breadth (overall): 68.52m
Operation: 22.07m
Maximum number of beds: 454
Helideck: Designed and built to support loads of up to 21t that may occur during operations.
Owner: Prosafe